W.D.Burch appreciates the opportunity to provide a formal quotation for your contract manufacturing outsourcing requirements. In order to provide the most accurate and timely response to your request, WDB has defined a minimum documentation package that will greatly facilitate the process and help ensure that your product is successfully produced and in the marketplace ahead of your competition at a competitive price. Providing this information in electronic file format will greatly aid the process and result in faster delivery of your quotation.

Assembly drawings (please ensure current revision level clearly indicated, include all applicable assembly notes and provide legible reference designators for all locations).

PCB Fab drawing and gerber files

Schematics

Bill of Materials. Please include the following information if available. Excel format is preferred (please indicate BOM revision level): EXAMPLE

 

ITEM NO.

PART #

DESCRIPTION

PART CLASS

PART
TYPE

QTY. PER ASSY.

REFERENCE DESIGNATION

MANUF.

MANUF. PART NUMBER

1

150015

CER.1UF 16V 5% Z5U

CAP-SMT

0805

3

C8,C9,C12

MALLORY

0805YC103 JAT

2

100011

ALUM 100UF 100V 20%

CAP-THT

RADIAL

2

C11,14

NICHICON

TUV100V 101M

3

290082

LCD Controller

IC-SMT

QFP60

1

U6

EPSON

S1D13305F00B100

4

720049

FILM 121K  5%

RES-SMT

0603

3

R5,6,7

VISHAY

CRCW06031213

 

Approved Manufacturers List. multiple different manufacturers and approved sources often can be used for same customer part number. Please supply a separate document listing the manufacturer and their part number aside your corresponding internal part number.

SPECIFIC QUOTE REQUESTS:  Please provide the following general information with each request for quote:

 

Company Name/Division

 

Company Web Site Address

 

Contact/Title

 

Phone Number

 

E-mail Address

 

Fax Number

 

Company address, Street

 

City, state, Zip

 

 

SPECIFIC PRODUCT INFORMATION: 

For each assembly to be quoted, please provide as much detailed information as possible.   Below is a guide to aid you with your RFQ.

 

ASSEMBLY ID

 

REVISION LEVEL

 

Annual Quantity/ Quarterly Rates

 

Assembly Quality (IPC 610A-Class 2 is Standard)

 

Monthly Releases/ (Build Increments)

 

In-Circuit Test? (# Nodes % Coverage)

 

TURNKEY or

CONSIGNED?

 

Anticipated start Date?

 

Single or Double Sided

 

Functional Test/Details

 

PCB Size/# Layers

 

Burn-in Requirements?

 

SMD? on 1 or 2 sides?

 

Labeling/ Serialization /Bar Coding?

 

Thru-Hole? on 1 or 2 sides?

 

Box-Build/ Integration?

 

BGA,Fine Pitch?

 

Special Shipping Requirements

 

Special Work Instructions

 

Final Pack-out